Compton, CA
Home MenuProjects
| CIP# | Project | Description | Cost | Start | End | Info |
|---|---|---|---|---|---|---|
| N/A | Freeway On/Off Ramp Pavement Rehabilitation (Central Ave, Wilmington Ave, Santa Fe, Alondra Blvd) | The project will address potholes and street issues at major on and off ramp locations | TBD | 05/04/19 | TBD | Details Last Update 05/09/2019 |
| N/A | Compton Blvd and Wilmington Ave Over Compton Creek Bridge Replacement Projects | Replace the bridges on Compton Blvd and Wilmington Ave over the Compton Creek and considering addition of bike facilities. | TBD | 12/31/2023 | 12/31/2026 | Details Last Update 05/02/2019 |
| 18-02 | Wilmington Ave Safe Streets Pedestrian / Bicycle Improvement Project (Design Phase) - Rosecrans Ave to Greenleaf Blvd | The project will address the need to provide safe crossings for students and residents at each intersection and improvements to access the Compton Creek Bike Path. | $447,043 | 02/12/19 | estimated 12/31/2022 |
Details Last Update 04/23/2019 |
| 18-03 | Compton Blvd Street (Design Services) | Provide full width roadway paving, add ADA ramps, raised median island, class ii bikeway, high visibility crosswalks, and LED lighting. | $1,467,812.01 | 12/6/18 | 12/31/2022 | Details Last Update 04/23/2019 |
| N/A Completed |
Citywide Pothole Repair Project (Phase 1) | Providing approximately 5,000 square yards of pothole preparation work/materials and 1,100 tons of asphalt installation work along major streets. | $640,000 | 12/17/18 | TBD | |
| 18-01 | Annual Street Rehabilitation -2A | Full reconstruction of the streets including specified sidewalks, curb and gutters, cross gutters, driveway approaches, curb ramps, signing, striping, speed hump and traffic loops on Alondra Blvd, Bullis Rd, Parmelee, and Stockwell/135th St. | $6,465,000 | 12/15/21 | 11/01/22 | Details |
| 18-01 | Annual Street Rehabilitation -2B | Full reconstruction of the streets including specified sidewalks, curb and gutters, cross gutters, driveway approaches, curb ramps, signing, striping, speed hump and traffic loops on Slater Ave, Compton Ave, Rosecrans Ave, and Santa Fe Ave. | $6,840,972 | 11/1/2022 | 7/31/2023 | Details |
| 18-01 | Annual Street Rehabilitation -2C | Full reconstruction of the streets including specified sidewalks, curb and gutters, cross gutters, driveway approaches, curb ramps, signing, striping, speed hump and traffic loops on Alameda St., Walnut St., Walnut Parkway, and Walnut Park Drive. | $7,177,270 | 11/1/2023 | 4/31/2024 | Details |
| 18-01 | Annual Street Rehabilitation -2D | Full reconstruction of the streets including specified sidewalks, curb and gutters, cross gutters, driveway approaches, curb ramps, signing, striping, speed hump and traffic loops on Bradfield Ave. and Greenleaf Blvd. | $3,024,120 | 8/1/2024 | 2/28/2025 | Details |
| 18-01 | Annual Residential Street Rehabilitation Project (Design Phase) | Review existing pavement conditions; identify all distressed pavement areas, curb-gutter, and sidewalks; make recommendations as to the extent and type of rehabilitation needed. | $518,000 | 11/14/18 | TBD | Details Last Update 04/23/2019 |
| N/A Completed |
Metro Rapid Bus Stations | Installation of Metro Rapid bus station amenities along Atlantic Blvd at three locations with the City limits. | $9,000 | 06/07/17 | 01/11/19 | Details (Metro Rapid Bus Stations) |
| N/A Completed | Citywide Pothole Repair Project (Phase 1) | Providing approximately 5,000 square yards of pothole preparation work/materials and 1,100 tons of asphalt installation work along major streets. | $640,000 | 12/17/2018 | TBD | Details (Citywide Pothole Repair Project (Phase 1) |
| 17-05 Completed |
Compton Blvd Resurfacing Project (Phase 1) | Installed hot mix overlay; traffic loops; signs/stripping; traffic pavement markers and curb painting | $553,011 | 11/13/17 | 12/18/17 | N/A |
| 17-01 Completed |
Central Blvd Resurfacing Project (Phase 2) - 131st to Compton Blvd | Repair, replace, and slurry sealed existing pavement. Install ADA compliant curb ramps, gutter, sidewalk improvements. | $2,137,386 | 04/26/18 | 12/18/18 | N/A |
| 15-03 Completed |
Compton Blvd Resurfacing Project (Phase 1) - Compton Blvd to Greenleaf Blvd | Repair, replace, and slurry sealed existing pavement. Install ADA compliant curb ramps, gutter, sidewalk improvements. | $1,688,160 | 06/06/16 | 10/18/16 | N/A |
| 15-01 Completed |
Safe Streets Pedestrian / Bicycle Improvement Project (Phase 1) Wilmington Ave | Improve pedestrian and bicycle safety adjacent to Wilmington Ave transportation corridor. Install bike lanes. | $1,396,430 | 12/16/16 | 04/11/17 | Details (CIP 15-01) |
| 14-01 Completed |
Residential Street Resurfacing | Replacement of sidewalks, curbs, gutters, and roadway pavement treatments | $2,032,008 | 10/07/14 | 01/19/16 | N/A |
| 13-02 Completed |
Street Rehabilitation (Residential) | Installed asphalt pavement; removing and replacing failed asphalt concrete area, installed ADA compliant ramps, street sign replacement | $2,683,660 | 03/19/15 | 06/21/16 | N/A |
| 13-01 | Street Rehabilitation Project Construction Phase | Street pavement rehabilitation | $2,400,000 | 02/25/19 | estimated 08/07/19 | Details Last Update 06/13/2019 |
| 10-20 Completed |
Sewer Replacement Project Wilmington and Alondra Area | Improvement and restoration of about 7.5 miles of sewer. Improvements include sewer cleaning, CCTV inspections, point repairs of pipes, in-place sewer lining, and manhole rehabilitation. | $2,393,555 | 05/12/16 | 09/05/17 | N/A |
| 10-18 Completed |
Sewer Replacement Project Compton and Wilmington Area | Construction of new VCP and Ductile Iron sewer mainlines; new sewer manholes; restoration and reconstruction of associated mainline construction and connections | $5,915,292 | 07/20/16 | 07/18/17 | N/A |
| 10-10 Completed |
Residential Street Overlay | Removal and replacement of sidewalks and driveways; removal of existing curbs and gutters from eligible CDBG residential streets | $1,516,496 | 06/02/10 | 01/18/11 | N/A |
| 09-12 Completed |
ARRA Preventive Street Maintenance | Grinding, overlay, and sidewalk repair at Poplar St, Laurel St, Acacia Ave, Tamarind Ave, Palmer St, and Alondra Blvd | $530,500 | 04/12/10 | 06/02/10 | N/A |
| 09-10 Completed |
ARRA Pavement Rehabilitation | Grinding, overlay, and sidewalk repair for ADA compliance on Greenleaf Blvd and Santa Fe Ave | $1,894,691 | 02/02/10 | 10/16/10 | N/A |
| 09-09 Completed |
Williams Alley Paving | Repave existing alley | $298,887 | 03/03/14 | 07/22/14 | N/A |
| 09-06 Completed |
Crane Ave Reconstruction | Removal and replacement of sidewalks and driveways between Rosecrans and Compton Blvd. Replacement of road surface between Rosecrans to Alondra Blvd. | $427,718 | 05/15/12 | 06/11/13 | N/A |